Proceedings of the Connecticut Association of Civil Engineers and Surveyors Association at Its 1st Annual Meeting1903 |
Dentro del libro
Resultados 1-5 de 14
Página 23
... volume one cubic yard , the Contractor is to remove same and if suitable in the opinion of the Engineer for rubble work , Contractor shall break same up and use them where stone is called for . All such boulders or ledge rock if not ...
... volume one cubic yard , the Contractor is to remove same and if suitable in the opinion of the Engineer for rubble work , Contractor shall break same up and use them where stone is called for . All such boulders or ledge rock if not ...
Página 120
... volumes for those missing years I will be glad to receive them . MR . MANNING : I would like to make an amendment to that motion , Mr. President . I think that a file of the Proceedings should be placed with the American Society . I ...
... volumes for those missing years I will be glad to receive them . MR . MANNING : I would like to make an amendment to that motion , Mr. President . I think that a file of the Proceedings should be placed with the American Society . I ...
Página 159
... volume , a quarter - barrel sack of Portland cement as packed by the manu- facturer being accepted as a cubic foot . The sand must be measured loosely . " ( Engineering News , October 9 , 1902. ) Going on to the question of the volumes ...
... volume , a quarter - barrel sack of Portland cement as packed by the manu- facturer being accepted as a cubic foot . The sand must be measured loosely . " ( Engineering News , October 9 , 1902. ) Going on to the question of the volumes ...
Página 160
... volume of concrete measured by taking 12 points along the edge and 4 through the center , the depth being taken as ... volume of 16.58 cu . ft . Sample No. 2 , mixed September 27th , 1899 , at 8.30 a . M.— Same mixture as No. 1 , gave ...
... volume of concrete measured by taking 12 points along the edge and 4 through the center , the depth being taken as ... volume of 16.58 cu . ft . Sample No. 2 , mixed September 27th , 1899 , at 8.30 a . M.— Same mixture as No. 1 , gave ...
Página 163
... volume of Portland . cement . Eight parts of volume of aggregate of stone , gravel and sand , " and again , " The proportion of stone , gravel and sand will be varied from time to time by the engineer as he may require , in order to ...
... volume of Portland . cement . Eight parts of volume of aggregate of stone , gravel and sand , " and again , " The proportion of stone , gravel and sand will be varied from time to time by the engineer as he may require , in order to ...
Otras ediciones - Ver todas
Proceedings of the Connecticut Association of Civil Engineers and Surveyors ... Vista completa - 1928 |
Proceedings of the Connecticut Association of Civil Engineers and Surveyors ... Vista completa - 1920 |
Proceedings of the Connecticut Association of Civil Engineers and Surveyors ... Vista completa - 1919 |
Términos y frases comunes
1900 Civil Engineer 24 inch pipe amendment annual meeting ballot Board of Direction Board of Sewer Boston brick bridge Bridgeport Britain broken stone building built BUNCE caisson candidates cast cent Chief Engineer Civil Engineer committee Company complete concrete Conn Connecticut Connecticut Society construction contract Contractor cubic foot cubic yard East Granby elected Engineer and Surveyor excavate feet filter beds Ford foundation furnished grade gravel Hartford Street Railway Haven Highway July 18 KELLOGG labor laid linear foot manholes Manufacturers March 30 masonry materials Meriden mortar motion number of votes Padang pavement piers plate girder plate girder bridge printed Punderford Railroad riprap river sand Secretary Sewer Commissioners SEWER PIPE Society of Civil span specific gravity steel Sumatra thereof tion tracks TRACY tunnel underdrains Vice President Vitrified voids volume Vorce West Hartford York ΙΟ
Pasajes populares
Página 26 - Contract shall be assigned, or placed in bankruptcy, or the work sublet by him, otherwise than as herein specified, or if at any time the Engineer shall be of the opinion, and shall so certify in writing to the...
Página 40 - ... all loss or damage arising out of the nature of the work aforesaid, or from the action of the elements...
Página 39 - If the work to be done under this contract shall be abandoned by the Contractor, or if this contract shall be assigned, or the work sublet by him, otherwise than as herein specified, or if at any time the Engineer shall be of the opinion, and shall so certify in writing to the...
Página 27 - Contractor, under and by virtue of this agreement or any part thereof; and in case such expense is less than the sum which would have been payable under this contract if the same had been completed by...
Página 39 - ... under and by virtue of this agreement or any part thereof, and in case such expense is less than the sum which would have been payable under this contract, if the same had been completed by said contractor, then the said party of the second part shall be entitled to receive the difference...
Página 19 - Engineer shall in all cases determine the amount, quality, acceptability and fitness of the several kinds of work and materials which are to be paid for under this contract ; shall determine all questions in relation to said work and the construction thereof...
Página 40 - ... provided, however, that no such estimate shall be required to be made when, in the judgment of the Engineer, the total value of the work done and materials incorporated in the work since the last preceding estimate amounts to less than five hundred dollars ($500).
Página 26 - ... that the said work, or any part thereof, Is unnecessarily or unreasonably delayed, or that the Contractor...
Página 29 - Board, pay the entire sum so found to be due hereunder, after deducting therefrom all previous payments and all amounts to be kept and all amounts to be retained under the provisions of this contract. All prior partial estimates shall be subject to correction in the final estimate and payment.
Página 27 - The commission may keep any moneys which would otherwise be payable at any time hereunder, and apply the same, or so much as may be necessary therefor, to the payment of any expenses, losses or damages incurred by the city or the commission, and determined as herein provided, and may retain, until all claims are settled, so much of such moneys as the commission shall be of...